CAPITAL PROJECTS

 

Capital Projects

07/12/2011 update

CP3019 Sale Rd Reconstruction -
Design Phase
This proposed design includes widening of the roadway for 2 12' travel lanes and one 14' turning lane
from Holly Hill Rd east to Canal Street. This will be a concrete curb and gutter section to match with
the existing westerly portion.
Engineer: Aillet, Fenner, Jolly & McClelland, Inc.
Start Date: September 2012
Completion Date: March 2013
AFC: $3,347,834
Designer's Fee: $194,977
 
 
CP3051 City Wide Striping
Restriping of City Streets
Engineer: Lancon Engineering
Start Date: July 2011
Completed Date: August 2011
AFC: $ 455,000
Designer's Fee: $37,600
 
CP3074 New Transit Facility
This project consists of the complete renovation of an existing 12,600 square foot building as well as
the new construction of bus transfer canopy, pavilion, fountain, and associated paving. All exterior
cladding will be removed and replaced with metal stud framing and brick veneer. New electrical and
mechanical systems will be provided. Site work includes demolition f all existing paving and canopy
structures and paving/paver work. Alternates accepted: 1327 sq ft open air canopy, water fountain and
associated paving and build out of the second floor.
Architect: Jeff Kudla
Contractor: Keiling Construction
Start Date: August 2011
Completion Date: Oct. 2012
Bid Award: $3,280,000
Designer's Fee: $225,957
 
CP3126 City Hall Window Replacement
Engineer: D. W. Jessen & Associates, L.L.C.
Preliminary Start Date: April 2011
Preliminary Completion Date: February 2012
Bid Award: $592,185.00
Engineering Fee: $38,983.00
 
CP3092 Traffic Upgrades-
Design Phase
Signal modernization at the following four intersections: 5th Avenue at Prien Lake Road, Kirkman Street
at 12th Street, Kirkman Street at Alamo Street, Lake Street at 18th Street.
Engineer: Lonnie Harper and Associates
Contractor: TBD
Preliminary Start Date: TBD
Preliminary Completion Date: TBD
Funds Available for Construction (AFC): $440,000.00
Engineering Fee: $35,669.65
Total Cost Estimate: $476,449.00
 
CP3128 WWTP - B/C-
Design Phase
Removal from service of existing Plant B/C; new pump station to divert flow to Plant D, and modification
and structural repair to existing influent pump station (if required).
New force main from the B/C pump station to the 54" influent line of Plant D, manifolding of pump
stations within Plant B/C service area with the new force main to divert flow to Plant D.
Engineer: Meyers and Associates
Contractor: TBD
Preliminary Start Date: TBD
Preliminary Completion Date: TBD
Funds Available for Construction (AFC): $6.875, 000.00
Engineering Fee: $439,411.00
Total Cost Estimate: $8,851,911.32
 
CP3141 Bilbo Street Reconstruction - Construction
Reconstruction from Clarence St. north approx. 300 feet
Engineer: D. W. Jessen & Associates, L.L.C.
Contractor: Asphalt & Associates
Preliminary Start Date: TBD
Preliminary Completion Date: TBD
Bid Award: $145,935.00
Engineering Fee: $10,738.00
 
CP3142 Sewer Pipe Bursting - Construction
Rose St. between 5th Ave. and Rose Terrace; Prien Lake Rd. from 5th Ave. East
Engineer: D. W. Jessen & Associates, L.L.C.
Contractor: Horseshoe Sub
Preliminary Start Date: July 2011
Preliminary Completion Date: November 2011
Bid Award: $ 119,471.00
Engineering Fee: $8,942.00
 
CP3127 Waste Water Treatment Plant "A" Improvements -
Construction Head works Improvements; Grit removal system rehabilitation; Concrete rehabilitation; Grating and
handrail rehabilitation; Addition of a mechanical bar screen; Screenings washer press; Final Clarifier
Improvements; Replace final clarifier weirs; Sludge Pumping; Replace the return and waste activated
sludge (RAS / WAS) pumps and motors; Digester Improvements Rehabilitation of the exiting air
system; Handrail and Grating Installation where needed;
Engineer: Manchac Consulting Group, Inc.
Contractor: Wharton Smith
Preliminary Start Date: August 2011
Preliminary Completion Date: November 2012
Bid Award: $ 3,747,000.00
Engineering Fee: $ 280,226.00
 
CP3116 Weaver Road Sidewalks-
Design Phase
New concrete sidewalk paving will occur from Jeff Wood Blvd to Stoneybrook (west side only) and
McNeese Street to Sale Road (east side only).
Engineer: D. W. Jessen & Associates, L.L.C.
Contractor: Asphalt & Associates
Preliminary Start Date: July 11
Preliminary Completion Date: November 2011
Bid Award: $320,799.00
Engineering Fees: $ 27,237.00
 
CP3116 Riverside Dr, Barbe Street, etc Sidewalks-
Design Phase
Install new concrete sidewalks in the following areas:
1. Riverside Dr (West Sallier Street to Shell Beach Drive)-(east side)
2. Barbe Street (West Sallier Street to Shell Beach Drive)-(east side)
Engineer: Lancon Engineers, Inc.
Preliminary Start Date: TBD
Preliminary Completion Date: TBD
Funds Available for Construction (AFC): $ 265,000.00
Engineering Fees: $ 22,844.00
Estimate cost: $256,275.00
 
CP3143 3rd Ave at 3rd Street-lift station rehab -
Design Phase
Rehabilitation of the existing sewer lift station at the intersection of 3rd St. and Third Ave.
Engineer: D. W. Jessen & Associates, L.L.C.
Preliminary Start Date: TBD
Preliminary Completion Date: TBD
Funds Available for Construction (AFC): $225,000.00
Engineering Fees: $19,653.00