  • Kirkman & Opelousas Intersection Modifications and Reconstruction
    Cost Estimate: $855,000.00 Scope of Work: Provide concrete repairs to the existing streets and draiange inlets at the intersection of N. Kirkman St. and Opelousas St. Construction of new roadway consisting of removal of roadway pavement, damaged or non ADA compliant sidewalk pavement, and draiange improvements required to construct this damaged intersection.
  • Streetscape Mill & Division
    Cost Estimate: $1,000,000.00 Scope of Work: Enhance pedestrian safety and beautify Mill and Division Streets along the new ERDACE Development from Ryan Street to Ann Street. This will be accomplished by the reconstruction of the sidewalks to include pavers. The scope of work shall also include overhead decorative lamp posts, litter receptacles, drainage and pavement markings
  • Ham Reid Road Utility Extension
    Cost Estimate: $1,085,300.00 Scope of Work: Water line looping on the north side of the proposed Ham Reid road extension between Big Lake Highway and Elliot Road, and the installation of various sewer line crossings along the Ham Reid Road Extension Route.
  • SE WTP Distribution System - South Park Drive Waterline Extension (E.Gauthier Rd. to Red David McCollister Rd.)
    Cost Estimate: $980,000 Scope of Work: Design of approximately 5000 ft of 24" inch water main on South Parrk Drive from E. Gauthier to Red Davis McCollister Rd.
  • SE WTP Distribution System - Gauthier Rd. Waterline Extension (Nelson Rd. to South Park)
    Cost Estimate: $1,760,000 Scope of Work: Installation of approximately 13,100 ft. of 18-inch water main on E Gauthier Rd. from South Park to Nelson.
  • SE WTP Distribution System - Red David McCollister Rd. Waterline Extension (South Park Dr. to HWY 14)
    Cost Estimate: $1,144,000 Scope of Work: Installation of approximately 6,000 ft. of 24-inch water main on Red Davis McCollister Rd from South Park Dr. to Hwy. 14.
  • SE WTP Distribution System - HWY 14 Waterline Extension (Gerstner Memoerial Blvd. to E. McNeese St)
    Cost Estimate: $1,364,000 Scope of Work: Installation of approximately 6,600 ft. of 20/24-inch water main on Highway 14 North from Gerstner Memorial Blvd to East McNeese Street.
  • 2019 Sidewalk Construction - Madeline St.
    Cost Estimate: $600,000.00 Scope of Work: Madeline St. (South Side); Common St. to Kirkman St.; Canal St. (West Side); Sale Rd. to W. McNeese; Nelson Rd. (West Side); McNeese St. South to Evergreen Apartments; Bilbo St. (Both Sides); Clarence St. to Kirby St.; Illinois St. (South Side); Brentwood to Walton
  • 2019 Sidewalk Construction - Canal St.
    Cost Estimate: $600,000.00 Scope of Work: Madeline St. (South Side); Common St. to Kirkman St.; Canal St. (West Side); Sale Rd. to W. McNeese; Nelson Rd. (West Side); McNeese St. South to Evergreen Apartments; Bilbo St. (Both Sides); Clarence St. to Kirby St.; Illinois St. (South Side); Brentwood to Walton
  • 2019 Sidewalk Construction - Nelson Rd.
    Cost Estimate: $600,000.00 Scope of Work: Madeline St. (South Side); Common St. to Kirkman St.; Canal St. (West Side); Sale Rd. to W. McNeese; Nelson Rd. (West Side); McNeese St. South to Evergreen Apartments; Bilbo St. (Both Sides); Clarence St. to Kirby St.; Illinois St. (South Side); Brentwood to Walton
  • 2019 Sidewalk Construction - Bilbo St
    Cost Estimate: $600,000.00 Scope of Work: Madeline St. (South Side); Common St. to Kirkman St.; Canal St. (West Side); Sale Rd. to W. McNeese; Nelson Rd. (West Side); McNeese St. South to Evergreen Apartments; Bilbo St. (Both Sides); Clarence St. to Kirby St.; Illinois St. (South Side); Brentwood to Walton
  • 2019 Sidewalk Construction - Illinois St.
    Cost Estimate: $600,000.00 Scope of Work: Madeline St. (South Side); Common St. to Kirkman St.; Canal St. (West Side); Sale Rd. to W. McNeese; Nelson Rd. (West Side); McNeese St. South to Evergreen Apartments; Bilbo St. (Both Sides); Clarence St. to Kirby St.; Illinois St. (South Side); Brentwood to Walton
  • 2019 Supplemental Infrastructure - Fruge St.
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - Fruge St.
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - 1st Ave.
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - Kirkman St
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - Weaver Rd.
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - Oregon St
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • 2019 Supplemental Infrastructure - Louisiana Ave
    Cost Estimate: $920,000.00 Scope of Work: Fruge St. (south side): Malcolm St. to Hwy 14; 1st. Ave. (east side): 12th St. to E. Prien Lake Rd.; Kirkman St. (west side): Prien Lake Rd. to Walters St.; Weaver Rd. (east side): McNeese St. to Country Club Rd.; Oregon St. (both sides): Texas St. to 1st Ave.; Louisiana Ave (west side): Division St. to Clement St.
  • Henderson Bayou Bridge Rehabilitation
    Cost Estimate: $350,000.00 Scope of Work: Installation of grout-filled encasement jackets around timber piles, pile bent bracing replacement, and small repairs on the concrete bridge structure.
  • Central School Renovation
    Cost Estimate: $500,000.00 Scope of Work: Exterior: Remove vegetation from building, powerwash & clean entire building, remove paint & re-paint exterior stairs and ramp, remove excess mastic and/or joint sealant on brick. Repoint existing brick joints, remove & replace existing roof gutters and down spouts, remove & replace existing fascia boards, repair cracks in stone, repaint and caulk all windows. Provide brick sealer on all brick locations. Interior: Remove and repair existing plaster / gyp wall
  • Lake Charles Civic Center Amphitheater Enhancements
    Cost Estimate: $300,000.00 Scope of Work: "1. Provide 2-200 Amp 3 phase power sources for Amphitheater show power. 2. Provide 4 new vendor power pedestals (one each near 4 existing in-ground power boxes). 3. Provide new area lighting as the West End of Millennium Park is lacking illumination. Remove HID Fixtures and poles. All new lighting to be LED."
  • Russell Street Bridge Rehabilitation
    Cost Estimate: $350,000.00 Scope of Work: Grout-filled jackets, new pile splices with galvanized channel bracing, repairs of underside concrete bridge structure, and sway bracing removal and placement.
  • Downtown Streetscape Phase II - Bilbo St between Division St & Mill St
    Cost Estimate: $500,000.00 Scope of Work: This project will concentrate on the traffic control and walkability of the streetscape by providing enhancement improvements consisting of special sidewalk paving, ADA improvements, parking bump outs, traffic control devices, etc. at the intersections of Bilbo and Division St as well as Bilbo and Mill St
  • Sallier Street Reconstruction Phase II - Lake St to Marine
    Cost Estimate: $9,063,500.00 Scope of Work: The project will focus on replacing an existing two-lane concrete roadway with a four-lane concrete boulevard. Improvements in storm drainage, sanitary sewer (collection and lift station) and potable water (distribution) facilities due to their required relocation.
  • W. Prien Lake Rd Widening Cove Ln to Ihles Rd - Clearing & Grubbing
    Cost Estimate: $300,000.00 Scope of Work: 1. The clearing of trees and shrubs located within the existing or newly acquired servitudes and road rights of way located along W. Prien Lake Road between Cove Lane and Ihles Rd and also along Sale Rd from W. Prien Lake to Burton Lane. 2. The demolition of the 5 homes located at 2804 Henderson Forest Lane, 2803 & 2804 S. Locke Point Dr and 2801 & 2802 N. Locke Point Dr. As well as the associated removal of driveways, sidewalks, pools, sheds, fencing, etc required to completely clear the lots.
  • W. Prien Lake Rd. Widening Cove Lane to Ihles Rd.
    Cost Estimate: $22,250,000.00 Scope of Work: Prien Lake Rd. from Cove Ln. South to Ihles Rd. Sale Rd. from Prien Lake Rd. east to Rue Chann Ann Henderson Bayou Rd. from Prien Lake Rd. west to Indian Bay Dr. All will be reconstructed with enclosed ditches with a new underground drainage system. 2 new sanitary lift stations will be installed along with gravity sewer lines. Water lines will remain in place where possible, portions will be replaced. 10" thick reinforced concrete pavement with curb and gutter.
  • Ihles Road Widening
    Cost Estimate: $11,327,500.00 Scope of Work: Replacing an existing two lane asphalt concrete roadway with a four-lane concrete curb and gutter roadway. The existing open roadside ditches will be replaced by a subsurface drainage system. Other improvements such as City-owned utility relocations, sidewalks, etc. will be implemented in the scope of work for the project. Right of way acquisition for the relocation of utilities and roadway expansion is anticipated.
  • 2019 Supplemental Infrastructure - Striping Package - 12th Street
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Alamo St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Alvin St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Bilbo St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Broad St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Clarence St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Cline St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Common St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Creole St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Division St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Ernest St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Goos Blvd
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Graham St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Hodges St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Jefferson St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Kirby St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Kirkman St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Lake St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Louie St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Louisiana Ave
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Main St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Medora St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Merganser St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Mill St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Moeling St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 4th Avenue Drainage Improvements - 6th Street to High School Park Lateral
    Cost Estimate: $1,300,000.00 Scope of Work: Installation of new storm water drainage pipe and drainage basins along the East side of 4th avenue commencing at High School Park lateral (just south of 1st street) and terminating at the intersection with 6th street. This new system will replace the existing inadequate and faulty drainage system along this route. Work includes sidewalk, driveway, and selected areas of street repair. Sewer and water line adjustments are anticipated.
  • 6th Avenue Reconstruction - 3rd St. to 6th St.
    Cost Estimate: $1,275,000.00 Scope of Work: 1. Construct a new 8" thick, 25-foot wide reinforced concrete pavement with integral curb and 6" compacted stone base. Replace and repair existing 4-foot wide plain concrete sidewalk on the east side of the street. Approximate project length is about 1300 in. The existing right of way of 6th Avenue is 60 foot wide and the existing pavement is concrete with a sidewalk on the east side. 2. Water: Replace the existing 6" cast iron water line with new 8" DR-18 AWWA C900 PVC water pipe including valves and fire hydrants as required. Tie into the existing water lines on 4th, 5th and 6th Streets. Tie the new 8" water line to meters with new service lines. The existing 6" water line is to be abandoned or removed. 3. Drainage: Install new underground drainage system that will extend the existing system at 3rd Street down to 6th Street. The existing drainage system on 6th Avenue will be removed and replaced with the new upgraded system. 4. Sewer: The existing 8" diameter lines will be reconstructed as required.
  • 2019 Supplemental Infrastructure - Striping Package - N. Central Pkwy
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Oak Park Blvd
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Oak Park Blvd
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Opelousas St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Penn St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Prater St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Prien Lake Rd
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Pujo St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Ryan St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - S. Central Pkwy
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Sallier St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - Shattuck St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplemental Infrastructure - Striping Package - W. Hale St
    Cost Estimate: $1,000,000.00 Scope of Work: 12th Street: Hodges St. to Hw14 (110 ft. east); Alamo St: Enterprise Blvd. to Ryan St.; Alvin St.: Sallier St. to Shell Beach Dr.; Bilbo St.: Kirby St. to Clarence St.; Broad St.: Lakeshoire Dr. to Enterprise Blvd; Clarence St.: Ryan St. to Kirkman St.; Cline St.: Albert St. to Hwy 171; Common St.: Sale Rd. to Kirby St.; Creole St.: W. Hale St. to Sallier St.; Division St.: Louisiana Ave. to Lakeshore Dr.; Eddy St.: Ryan St. to Ernest St.; Ernest St.: Sale Rd. to Sallier St.; Goos Blvd.: Broad St. to Winterhalter St.; Graham St.: Medora St. to Fitzenreiter Rd.; Hodges St.: Alamo St. to Belden St.; Jefferson St.: Lake St. to 2nd University Dr.; Kirby St.: Ryan St. to Lakeshore Dr.; Kirkman St.: McNeese St. to Opelousas St.; Lake St.: Sale Rd. to College St.; Legion St.: 1-210 to Honker Rd; Louie St.: Lake St. to Ryan St.; Louisiana Ave.: Azalea St. to Prien Lake Rd.; Main St.: Broad St. to Avenue J; Medora St.: Simmons St. to Hwy 171 Merganser St.: J.B. Johnston to Mallard Cove; Mill St.: Lake Shore Dr. to Hwy 171; Moeling St.: Enterprise Blvd. to Hwy 171; N. Central Pkwy: University Dr. to Archwood; Oak Park Blvd: Enterprise Blvd to Hwy 171; Opelousas St.: Enterprise Blvd to Hwy 171; Penn St.: Creole St. to Ernest St.; Prater St.: Fitzenreiter Rd. to South of Jackson St.; Prien Lake Rd.: Ryan St. to Hwy 14 Pujo St.: Enterprise Blvd to Kirkman St.; Ryan St.: South of Bridge south of Clarence St. to 300ft. west of River Rd.; S. Central Pkwy.: Univerisity Dr. to Heather St.; Sallier St.: Marine St. to Lake St.; Shattuck St.: Broad St. to Moeling St.; W. Hale St.: Creole St. to Ernest St.
  • 2019 Supplamental Infrastructure - Overlay Pkg 1 - W. Alley
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Fournet St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - N Lyons St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - N. Malcolm St.
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Gieffers St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Griffin St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Harless St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - N. Shattuck St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Hagan St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Franklin St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 1 - Ruley St
    Cost Estimate: $800,000.00 Scope of Work: W. Alley: N. Blake St. to Shattuck St; Fournet St: Enterprise Blvd to N. Blake St.; N. Lyons St.: Jackson St. to Opelousas St.; N. Malcolm St: Commercial St. to Geiffers St; Gieffers St.: Malcom St. to Lincoln St.; Griffin St.: Prater St. to Pear St.; Pear St: Griffin St. to Woodring St.; Harless St.: N. Goos Blvd to N. Shattuck St.; N. Shattuck St.: Harless St. to North to dead end; Hagan St.: N. Shattuck St. to N. Goos Blvd.; Franklin St.: Opelousas St. to N. Railroad Ave.; Ruley St.: Hagen St. to North to dead end
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Riverridge Dr.
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - A. Miller Rd
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Lawrence Ln
    Cost Estimate: 807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Salene Rd
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Ray St
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Pear St
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Hodges St
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - East St
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.
  • 2019 Supplemental Infrastructure - Overlay Pkg 2 - Pear St
    Cost Estimate: $807,000.00 Scope of Work: Riverridge Dr.: Lisle Peters Rd. to Dead End; A. Miller Rd.: Country Club Rd (384) to Dead End; Lawrence Ln.: Country Club Rd. (384) to Dead End; Salene Rd.: Country Club Rd (384) to Dead End; Ray St.: Booker St. to N. Adams St.; Pear St: Opelousas St. North to Dead End; Hodges St: Clearence St. to 12th St.; East St.: Bilbo St. to Ryan St.; Pear St.: Martha St. to Commercial St.