SE WTP Distribution System - South Park Drive Waterline Extension (E.Gauthier Rd. to Red David McCollister Rd.)
Cost Estimate: $980,000 Scope of Work: Design of approximately 5000 ft of 24" inch water main on South Parrk Drive from E. Gauthier to Red Davis McCollister Rd. -
SE WTP Distribution System - Gauthier Rd. Waterline Extension (Nelson Rd. to South Park)
Cost Estimate: $1,760,000 Scope of Work: Installation of approximately 13,100 ft. of 18-inch water main on E Gauthier Rd. from South Park to Nelson. -
SE WTP Distribution System - Red David McCollister Rd. Waterline Extension (South Park Dr. to HWY 14)
Cost Estimate: $1,144,000 Scope of Work: Installation of approximately 6,000 ft. of 24-inch water main on Red Davis McCollister Rd from South Park Dr. to Hwy. 14. -
SE WTP Distribution System - HWY 14 Waterline Extension (Gerstner Memoerial Blvd. to E. McNeese St)
Cost Estimate: $1,364,000 Scope of Work: Installation of approximately 6,600 ft. of 20/24-inch water main on Highway 14 North from Gerstner Memorial Blvd to East McNeese Street. -
Downtown Streetscape Phase II - Bilbo St between Division St & Mill St
Cost Estimate: $500,000.00 Scope of Work: This project will concentrate on the traffic control and walkability of the streetscape by providing enhancement improvements consisting of special sidewalk paving, ADA improvements, parking bump outs, traffic control devices, etc. at the intersections of Bilbo and Division St as well as Bilbo and Mill St -
W. Prien Lake Rd. Widening Cove Lane to Ihles Rd.
Cost Estimate: $22,250,000.00 Scope of Work: Prien Lake Rd. from Cove Ln. South to Ihles Rd. Sale Rd. from Prien Lake Rd. east to Rue Chann Ann Henderson Bayou Rd. from Prien Lake Rd. west to Indian Bay Dr. All will be reconstructed with enclosed ditches with a new underground drainage system. 2 new sanitary lift stations will be installed along with gravity sewer lines. Water lines will remain in place where possible, portions will be replaced. 10" thick reinforced concrete pavement with curb and gutter. -
6th Avenue Reconstruction - 3rd St. to 6th St.
Cost Estimate: $1,275,000.00 Scope of Work: 1. Construct a new 8" thick, 25-foot wide reinforced concrete pavement with integral curb and 6" compacted stone base. Replace and repair existing 4-foot wide plain concrete sidewalk on the east side of the street. Approximate project length is about 1300 in. The existing right of way of 6th Avenue is 60 foot wide and the existing pavement is concrete with a sidewalk on the east side. 2. Water: Replace the existing 6" cast iron water line with new 8" DR-18 AWWA C900 PVC water pipe including valves and fire hydrants as required. Tie into the existing water lines on 4th, 5th and 6th Streets. Tie the new 8" water line to meters with new service lines. The existing 6" water line is to be abandoned or removed. 3. Drainage: Install new underground drainage system that will extend the existing system at 3rd Street down to 6th Street. The existing drainage system on 6th Avenue will be removed and replaced with the new upgraded system. 4. Sewer: The existing 8" diameter lines will be reconstructed as required. -
Enterprise Blvd. From 12th St. to Broad St.
Cost Estimate: $4,125,000 Scope of Work: This project will consist of a partial reconstruction and full overlay of Enterprise Blvd. from 12th Street to Broad Street. Occasional drainage improvements, new 8 inch water main, and new sewer manholes. -
Sally Mae Drainage Improvement
Cost estimate: $489,985 Scope of work: Installing culverts in existing drainage ditches and performing an asphalt overlay. -
Event Center Boardwalk Phase I
Cost estimate: $3,200,000 Scope of work: Installation of approximately 1000 linear feet of steel cantilever retaining wall including filter fabric, soil and stone backfill, demolition and drainage pipe installation along North Beach into the Lake in front o the Port Wonder site extending easterly to the east side of the existing parking garage.